Environmental Investigation acc. §13 ALSAG for Potential Contaminated Site „Kindergarten Rettenbach“

Spielplatz Kindergarten Rettenbach

Environmental Investigation acc. §13 ALSAG for Potential Contaminated Site "Kindergarten Rettenbach"

The historical landfill consits mainly from earth material, construction wastes and in minor parts household wastes.

On this historical landfill a kindergarten was erected.

Within the project a risk assessment regarding size of the landfill, deposited wastes and the risk of landfill gas production was undertaken.

Therefore blp GeoServices Ltd. made drillings, took soil samples and measured gas production.

It could be stated that no major risk for the environment and human beings exists.

Duration / Customer

June 2009-July 2010

AMT DER OBERÖSTERREICHISCHEN LANDESREGIERUNG
Direktion Umwelt und Wasserwirtschaft
Abteilung Anlagen, Umwelt und Wasserrecht

 

What are you looking for?

Last posts

Share on Social Media

Related articles

Construction and waste management

Investigation of Polluted Building Stock, Rufling

Project Description The company HD Immo builds two new residential units in the project living greener in Rufling in Upper …

Read More
Ausschreibung
Commercial and industrial

Underground Investigation and Remediation – cross-laminated timber (CLT) production Mayr-Melnhof Leoben

Underground Investigation and Remediation Mayr Melnhof Holz Leoben Ltd. bought a brownfield site previously used by Novopan OG to build …

Read More
Field work - Hands on soil and groundwater

Water Monitoring for S 10 Mühlviertler Schnellstraße

Water Monitoring for S10 Mühlviertler Schnellstrasse More than 500 monitoring wells, private water supplies like wells and springs, ponds and …

Read More
Standort Linz
Kapuzinerstraße 84a, 4020 Linz
Standort Wien
Rothkirchgasse 4/7, 1120 Wien